“AGL MINING HAS THE MOST EXPERIENCED STRUCTURE TO PUT THE ALL MINING & COMMERCIAL RISKS IN FRONT OF YOU”

AGL MINING

Who We Are?

We are an experimented engineering team which is focused on mine development. We are ready to accompany you in all stages of a mine from preliminary research to production.

Our Mission

We are here to make your investment successful with minimal risk.
The important thing is the risk analysis you make on the table before making your investment.

Our Vision

We are here to make your investment successful with minimal risk.
The important thing is the risk analysis you make on the table before making your investment.

Why Choose Us

The AGL team has a great deal of experience in mining and operation experience. It also has high quality associations for both sturt up level and high level facility design and installation. Shortly, when you choose us, we will support you at all stages from Geological Explorations to production of your project.

PRE-GEOLOGICAL WORK

The most important issue for a Green-Field project is the narrowing of the field and the preparation of economic plans.
Before field studies, we scan the literature related to the region and collect the information you have. With these evaluations, we prepare for the field and plan the site visit.
This stage can take from 1-2 days to 1-2 months. The size of this site may vary depending on the information we have.
In the first stage, we conduct field investigations enough to understand what strategy we should apply to carry out detailed research of the field.
From soil sampling, geological mapping and geophysical studies, we do all the necessary studies according to the needs of the site.
After this phase, we present you a Pre-Geological Study Report for your site.

Read more

GEOLOGICAL WORKS

To see the real value and mining potential of your site, it is necessary to conduct geological research in internationally valid JORK and NI 43-101 standards.
For this reason, working on the Pre-Geological study report is evaluated at this stage.
According to these results, the actual reserve status of the site is monitored both by testing and drillings.
After all data is collected, the area to be mining is put on the table in terms of both reserve and economy.
All planning and engineering support begins to be received according to the mining work to be done. A detailed study, including metallurgical tests, should be made to show that the site is feasible at international standards.

Read more

DRILLING MANAGEMENT

We need to do Geophysical and Drilling studies to clearly see the entire structure of the field and the reserve status also showing grade.
In this process, we will ensure that your reporting is completed in the most accurate way by agreeing with the companies that provide you with the best service.
Our motto here is: Best Quality and Cheapest Engineering!

Read more

NI-43/101 GEOLOGICAL REPORT

After all these stages, you will need a report signed by internationally recognized experts for your project to be Brown Field and Bankable.
When you have this report, everyone will be able to see your final and possible reserves without any doubt. It will be accepted for the use of loans in banks and financial institutions.
If you submit all this research project to these authorized companies, you will be faced with very high costs.
We carry out the whole process from signature and reporting stage to international standards at the most affordable cost for you, and we ensure that you get support from the appropriate company for the report.

Read more

RISK MANAGEMENT

“YOU CAN MINIMIZE YOUR RISK IF YOU MAKE A GOOD EVELUATION FOR YOUR VENTURE CAPITAL”

As you see in the table below; the risk decreases with each step, but the project price increases in parallel. This means your profit will be higher if you take risks at the start of the project. But if you don’t want to take risks, you can join a Brownfield-era project.